NEDA is a highly expansive mortar that breaks rock and concrete safely and silently. It generates 18,000 PSI of expansive power when mixed with water, cracking rocks without vibration, noise, or flyrock.

The Application Process

Simple 4-step application requires no heavy machinery or licensed blasters.

01

Drill Pattern

Drill holes of 38mm-50mm diameter. Spacing is calculated based on rock hardness and free face availability.

02

Mix Agent

Mix the NEDA powder with clean water until a smooth, lump-free slurry is achieved. Follow the specific mixing guide provided.

03

Pour & Fill

Pour the mixture into holes immediately after mixing. Fill to the top; no stemming or plugging is required.

04

Expansion

The agent expands with 18,000 PSI force. Cracks initiate within 4-24 hours depending on ambient temperature.

Technical Specifications

Expansive Pressure> 120 MPa (18,000 PSI)
Hole Diameter38mm - 50mm
Reaction Time4 - 24 Hours
Shelf Life2 Years (Dry Storage)
HS Code3824.99.99
pH Value12.5 (Alkaline)

Reaction Temperature Warning

NEDA generates heat during hydration. Do not look directly into filled holes. Use safety goggles. Select the correct temperature grade below to prevent "blowouts".

Product Grades

SCA-1

Tropical / Summer Grade
25°C - 40°C

Recommended Ambient Rock Temperature

SCA-2

Standard Grade
10°C - 25°C

Recommended Ambient Rock Temperature

SCA-3

High Altitude / Winter
-5°C - 10°C

Recommended Ambient Rock Temperature

Available in 5kg bags (4 bags per box)

Why Switch to NEDA?

Compare the operational impact of chemical breaking versus traditional blasting methods.

Traditional Blasting

Safety Radius500m Evacuation
Operational Downtime2-4 Hours
Ground VibrationHigh Risk
Permit ComplexityHigh (Police/Gov)

NEDA Technology

Non-Explosive Demolition Agent
Safety Radius50m Safe Zone
Operational DowntimeZero Downtime
Ground VibrationNone (Silent)
Permit ComplexityLow (Non-Explosive)

Plan your demolition